The attic contained (estimated) 400m3 of hay, which is between 50 and 150 years old. Because we have fit the main electric over the attic and the construction of the roof has to be repaired, we have to claer the attic of the hay. Through a slide, pitchfork and the hayexpress the hay is transported to the forest. Also a start has been made in strengthening the roof and construction. Each old rafter gets a new beam which is made by hand and forced into place, to make de roof straight and better. After 7 trusters, 3 highbeams ad 6 tensionrafters (11/8/17) a change to the roof is clearly visable.